Menu
Book a walkthrough

Lhuta dates each finding in a NÚKIB-registered plant's export for its head of IT.

Its model reads the export and the week's disclosures, dates each exposed machine from the act, your dating policy and KEV, proposes the window that stops no line, then waits.

Book a walkthrough
The week view for two plants: six machines, each with its due date, the rule behind it and its window; the line PCs go into the 27 December shutdown.
The note on the week's finding: Plzeň hall 2, Tuesday's export; 14 PCs have the flaw added to KEV; due by the 27 December shutdown; waiting on the head of IT.

For the three IT people of a lower-regime plant. A car maker's security team would find it small.

I was that head of IT: two plants, three administrators, the register in Excel beside a Nessus license. So Lhuta reads what your scanner already found, Nessus, Tenable, Qualys, Rapid7 or ESET, and looks for nothing else.

Plzeňtwo hallsMladá Boleslavone hall, the office estate
  • Higher regime

    A car maker with a SOC and a manažer kybernetické bezpečnosti needs Cogent's policy engine over cloud, code and endpoints, not a plant register.

  • No scanner

    Lhuta reads your scanner's export. It is not one, and not an MSSP's resale kit.

  • Lower regime

    Medium or large under decree 408/2025, CZ-NACE 26 to 30, on Portál NÚKIB, with line PCs that wait for the shutdown.

Approved security updates issued for technical assets are applied bezodkladně, without delay.

Decree 410/2025 Sb., § 12(a), the security measures of the lower regime; no number of days is given. The one-year period began the day NÚKIB, the Czech cyber security authority, accepted your registration, and the measures overview the jednatel signs is where its inspection reads whether you kept it.

MonTueWedThuFriSatSunDecember3012345678910111213141516171819202122232425262728293031123DecemberMonTueWedThuFriSatSun141516171819202122232425262728293031123

Fourteen line PCs in Plzeň hall 2, and the model's case for waiting until the 27 December shutdown.

The plant is drawn, not a customer. A row the model is less than nine in ten sure of gets both readings and no date until you place it; the rest it dates, proposes and drafts, and the ticket stays a draft until you approve each line.

lhuta.cc · Finding · Plzeň hall 2

The product's page for a finding, laid out like a maintenance work order: where it is, when it is due, what is proposed, what it wrote; nothing runs unapproved.
  1. Tuesday's export

    Four thousand findings read beside the week's KEV, EUVD and vendor entries. One matches.

  2. Hall 2, Plzeň

    Fourteen line PCs, reachable through the maintenance jump host. The PLCs behind them: not scanned, not touched.

  3. Three rules

    The act says without delay; the KEV entry carries its own date; your dating policy, seven days for the office estate. The stricter wins.

  4. Tonight, then the shutdown

    Twelve laptops through WSUS tonight; the line PCs on 27 to 30 December with the OEM's validated image, a jump-host rule until then.

  5. Written, not run

    One ticket, one questionnaire line, one measures entry, each a draft until you approve it.

Founded in Prague in April 2026.

The models compute in Frankfurt, inside the EU. Nothing is executed on a customer's plant without the head of IT's approval; a scoped walkthrough comes first.

October 2026

Frankfurt

Lhuta · Register · week of 13 October

Register, week of 13 October: Plzeň and Mladá Boleslav

The model wrote each date and the rule under it. The head of IT changed one line, the jump-host rule, narrowed to the two maintenance accounts; the record keeps both versions.

  • Line PC, Plzeň hall 2

    Remote-maintenance software has the flaw added to KEV this week; reachable through the jump host

    27 Dec, at the shutdown; jump-host rule until then (KEV due date read with the plant window)

  • Office laptop, Mladá Boleslav

    Tuesday's cumulative update not yet applied

    Tonight, canary cohort through WSUS (dating policy: KEV-listed, office estate, seven days)

  • HMI, Mladá Boleslav hall 1

    Image the vendor no longer updates

    Recorded as unsupported, traffic limited to the maintenance network (decree 410/2025 § 12(b))

  • File server, Plzeň office

    Critical in the export, no exploit listed, backported package

    Marked patched from the backport table; your next export confirms (no date owed)

  • Maintenance jump host, Plzeň

    Remote-access service one version behind the advisory

    20 Oct, in the Sunday window (dating policy: critical, thirty days, moved earlier by reachability)

  • Label printer PC, Mladá Boleslav

    Operating system out of support

    Recorded as unsupported; replacement at the shutdown (decree 410/2025 § 12(b))

The scanner called the file server vulnerable; the backport table says otherwise.

One week's register at the drawn example plant: two plants, six of its lines shown

Maintenance jump host, PlzeňPlzeň, hall 2Line PC 1Line PC 8Line PC 2Line PC 9Line PC 3Line PC 10Line PC 4Line PC 11Line PC 5Line PC 12Line PC 6Line PC 13Line PC 7Line PC 14PLCs behind each line, not scanned, not touchedMaintenance jump host, PlzeňPlzeň, hall 2Line PC 1Line PC 8Line PC 2Line PC 9Line PC 3Line PC 10Line PC 4Line PC 11Line PC 5Line PC 12Line PC 6Line PC 13Line PC 7Line PC 14PLCs behind each line,not scanned, not touched

A drawn example plant, not a customer's data. Machines are named in plain words; no CVE numbers, no scores.

Three papers written from the same record, so nobody writes them from memory in Word.

The Tier 1's questionnaire answer, the month's entry in the measures overview kept four years, and the register of unsupported assets with their traffic limited. Exported as spreadsheet, document or PDF whenever you want them.

  • The Tier 1 portal's question on time to remediate critical vulnerabilities, and the answer drafted from the register on 15 October, for the head of IT to send.

    The questionnaire answer

    drafted for the head of IT to send.

    week of 13 October

  • The October entry of the measures overview: updates applied without delay, the work done, approved by the head of IT, signed by the jednatel, kept four years.

    The October measures entry

    done, approved, signed. Kept four years.

    week of 13 October

  • The register of unsupported assets: an HMI in Mladá Boleslav, two line PCs, a label printer PC, each with traffic limited to the maintenance network and a date.

    The unsupported assets

    an HMI, two line PCs, a label printer PC.

    week of 13 October

Lhuta patches nothing, scans nothing, reboots nothing and touches no PLC.

It drafts, dates and waits for the head of IT. It replaces none of Nessus, ESET PROTECT, WSUS or your firewall, and it never runs overnight or at the weekend without you, unlike the autonomous fleets on sale. A drafted fix is not a fix until you approve it and your people apply it.

One sitting a week, on Thursday after the Tuesday export, is what this costs you.

Four decisions, each kept with your name and the time for the auditor and for NÚKIB's kontrola (inspection). What you refuse stays refused, and a week nobody sits is a week nothing moves.

The model drafted the four; you decide each. Lhuta makes you set the number for bezodkladně yourself, and a date you miss stays in the four-year record.

  • The canary cohort

    Twelve laptops through WSUS tonight, or your set.

  • The window

    The shutdown as proposed, or the vedoucí údržby's date.

  • The compensating control

    The jump-host rule as named, or yours.

  • The papers

    The questionnaire line and measures entry, to the jednatel.

lhuta.cc · Record · week of 13 October

The record of one week's decisions: four rows approved or changed by the head of IT, Thursday 9:40; the jump-host rule narrowed. Nothing in it ran before that.

A walkthrough on your own export, with your line PCs named.

I ask for your plants and your scanner because a Nessus CSV and an ESET report are not the same file, and I would rather have the right one ready before we talk.

  1. The walkthrough that week, on your last export and asset list.

  2. Your line PCs and HMIs named, the next shutdown's date entered.

  3. Before it, a call from me within two working days.

  4. Or upload the export yourself; your register is ready next business day.

PlzeňHall 1Press 1Press 2Press 3Trim cellWeld cellPaint robotOvenInspectionPackingHall 2Line PC 1Line PC 2Line PC 3Line PC 4Line PC 5Line PC 6Line PC 7Line PC 8Line PC 9Line PC 10Line PC 11Line PC 12Line PC 13Line PC 14Mladá BoleslavHall 1HMIPressWeld cellTrim cellRobotOvenInspectionLabel printer PCPackingOfficeOffice estate on WSUS, laptops and the file serverFile serverWSUSJump hostPlzeňHall 1Press 1Press 2Weld cellPaint robotHall 2Line PC 1Line PC 2Line PC 3Line PC 4

€490 per plant per month, whatever the number of machines in it.

A plant is one site with its own shutdown calendar and its own measures entry. From three plants, €390 per plant per month, invoiced yearly, with a second approver for the group's IT lead.

Plant

€490per plant / month

We run one or two plants

One or two plants, each with its own calendar and its own measures entry; monthly, cancel at month end.

  • The weekly register with a due date and rule under every finding
  • Proposed fix, window and compensating control, waiting for approval
  • Ticket into Jira or ServiceNow, the questionnaire line, the measures entry
  • Your export read weekly against the asset list, KEV and EUVD
  • A due date under every finding, or the rule none is owed
  • The drafted fix, window, ticket and papers; the four-year record
Book a walkthrough

The walkthrough costs nothing and needs no card

Cancel at month end; your first invoice's figure stands for a year

GroupYearly

€390per plant / month, from three plants

We run three plants or more

Three plants or more under one overview, invoiced yearly; a second approver for the group's IT lead.

  • Everything in Plant, for every plant in the group
  • One measures overview and one questionnaire answer across the plants
  • A second approver and single sign-on for the group

Nessus Professional is $4,790 a year for the scanner alone; patch tools charge per endpoint. Neither dates a finding from the act.

Not counted: walkthrough, connectors, seats for the jednatel, maintenance and an auditor.

Two thousand endpoints pay what a hundred and fifty pay. If a patch tool can reboot your estate on a Tuesday night, keep it and your ESET module.

Your request has been received.

Expect a message from Lhuta. It goes to the address you gave.